Tampines North Polyclinic is a 4-storey polyclinic with a basement carpark level, located at the junction of Tampines Avenue 6 and Tampines Street 61, developed for MOH Holdings and officially opened on 29 September 2023 as the tenth polyclinic under SingHealth Polyclinics. The facility was built to serve the growing population of the new Tampines North estate, supplementing the original Tampines Polyclinic, which has operated in the area since 1990.

The building adopts a green-themed design with leaf motifs and surrounding gardens, housing a comprehensive range of primary care services across its four levels, including outpatient care for chronic and acute conditions, women’s and children’s health services, immunisations, allied health services such as physiotherapy and podiatry, and diagnostic and radiological services including X-ray, mammogram, and ultrasound. Each multidisciplinary care team is co-located within the same module, supporting an integrated model of care across departments.

BIM modelling, BIM coordination, BIM management, and as-built checks were carried out for client Vigcon, coordinating the facility’s architectural, structural, and MEP systems across its clinical, diagnostic, and basement carpark levels to support a healthcare building with a wide range of specialised departmental requirements within a single compact footprint.

Details

Client

Vigcon Construction

Size

5,738 sqm GFA

Location

Singapore

Construction Start Year

2018

Industry

Healthcare

Completion Year

2023